Hounslow West to Hounslow Central - Piccadilly Line

Client: Tube Lines
Finished: June 2008
Duration: 32 weeks

This contract involved stabilising 800m of subsiding cutting on both sides of the track.

A challenge was presented by the installation of temporary works, which was overcome with use of platypus anchors.

Rather than carry out all work from the top of the embankment, we suggested using a ramp down to the bottom of the cutting as shown.

Our novel approach to inserting scaffold poles through hard ground: adaptation of an excavator breaker.

Part of the completed section of cutting.

Tube Lines' Beacon Site Award was presented to the site team in recognition of an impeccable safety record.

“Joywheel have completed a number of projects for the Earth Structure Remediation team, including the largest construction managed project the ESR team undertook in RP1. They have a professional and positive attitude on site and consistently work to a very high standard. Health & Safety is never compromised and this has been rewarded with Tube Lines Beacon Status award. Joywheel became the frst contractor working for Tube Lines to achieve a hatrick of awards. Their knowledge and experience of working on the underground is second to none, which leads to quality workmanship delivered on time and on budget. Each and every employee has a can do attitude and takes pride in the work they do, none more so than their foreman Jim Chapman who has exceptional leadership qualities, and a eye for the smallest detail.”

- Martyn Tribe, Construction Manager, Tube Lines